No DropDowns for this Checklist

Preparations of the Armament & Radar Systems

1) Turn On the “Sight Heating” Switch. While the ASP-5 Gunsight and AR-18-8 Radar Sight indications appear instantly, the Sight Heating assures correct sight operation at Low Temperatures.

2) Turn On the “Sight” Switch. The Yellow Circle with the Center Dot Cannon Aiming Point should appear on the Glass of the ASP-5N Gunsight.

3) Turn On the “Izumrud” Switch. The RP-5 “Izumrud” radar should take 2-3 minutes to warm up and be ready for use.

4) Turn On the “O-57K” Power Switch.

5) Turn On both “Left” And “Right” Cannon Power Switches.


Please enter typos and erros in this checklist here
Please enter recommendations and ideas for this checklist here